Global Data Center Lighting Market Outlook, 2031

Global Data Center Lighting Market rises on TIA-942-C vertical illuminance of 200 lux on the rack face.

The global data center lighting market is a critical-environment lighting market in which luminaires must satisfy three key requirements: data centre infrastructure standards, life-safety codes and energy-efficiency regulations. These requirements influence illuminance levels, fixture positioning, emergency power arrangements and lighting controls. TIA-942-C, the 2024 edition of the ANSI/TIA data center infrastructure standard, establishes white-space illuminance requirements of 500 lux on the horizontal plane and 200 lux on the vertical plane in occupied aisles. Measurements are taken one metre above the finished floor at the aisle centreline. The vertical illuminance requirement is particularly important because technicians need to read rack labels, status indicators, port information and fibre connectors at eye level. Meeting this requirement involves positioning luminaires along the aisle centreline and using narrow-aisle optics rather than placing fixtures directly above the racks. Hot aisles can have lower vertical illuminance of 300–500 lux because equipment at the rear of cabinets is accessed less frequently and ambient temperatures are higher.

EN 50600 and its international counterpart, ISO/IEC 22237, establish availability, security and energy-efficiency classifications for data centres. However, they do not provide a separate illuminance table. Lighting requirements are instead derived from EN 12464-1 for plant rooms and control rooms and from TIA-942 for white spaces. European data centres may therefore use both frameworks when specifying lighting systems. China's GB 50174-2017 specifies general lighting of 300–500 lux in main computer rooms and auxiliary areas, with a colour rendering index of at least 80 and uniformity of at least 0.7. It prohibits locating luminaires directly above equipment. Standby lighting must provide at least 10% of general illuminance and at least 50% in manned rooms. Evacuation lighting must provide at least 5 lux in the main computer room corridor and 1 lux in other areas. India's Energy Conservation Building Code (ECBC) applies to data centres with an IT design load above 100 kW. It establishes lighting power density limits and mandatory control requirements. The ECBC User Guide for Data Centers provides the compliance pathway and treats lighting as a separately metered end use.

What's Inside a Bonafide Research`s industry report?

A Bonafide Research industry report provides in-depth market analysis, trends, competitive insights, and strategic recommendations to help businesses make informed decisions.

Download Sample
Life-safety and availability requirements impose additional specifications beyond normal white-space illumination. NFPA 101 classifies data centres as special-purpose industrial occupancies. Egress lighting must provide an average of 1 foot-candle (10.8 lux) at floor level, with no point below 0.1 foot-candle (1.1 lux), and a maximum-to-minimum ratio of 40:1. Emergency lighting must operate for at least 90 minutes and transfer within 10 seconds. Monthly 30-second functional tests and annual 90-minute duration tests must be documented in writing. The Uptime Institute Tier framework adds redundancy requirements to the lighting installation. Tier III concurrently maintainable facilities require dual feeds and maintainability, while Tier IV fault-tolerant facilities require dual circuits, independent emergency systems and zonal redundancy. Lighting therefore becomes part of the facility's availability architecture rather than a conventional installation supported by a single circuit and battery backup. ASHRAE 90.1-2025 expands partial-OFF and full-OFF occupancy-sensing requirements to data centres. This brings white spaces and support rooms within the occupancy-control requirements applied to other commercial spaces. The EU Energy Performance of Buildings Directive (EPBD) 2024 introduces another requirement for applicable non-residential buildings. Lighting does not count towards the 290 kW or 70 kW threshold that triggers building automation and control system requirements. However, when a building exceeds the threshold because of its HVAC capacity, it must still implement automatic lighting controls in its non-residential areas. This includes relevant support spaces and administrative zones even when white-space lighting is controlled separately.

IEC 60598-2-1:2025 is the fixed general-purpose luminaire safety standard governing recessed, surface-mounted and suspended fixtures used in data centre white spaces and support areas. Published as Edition 3.0 in December 2025, it addresses resistance to dust, solid objects and moisture, creepage distances, clearances, endurance and thermal testing. Recessed air-handling luminaires are additionally governed by IEC 60598-2-2. Emergency lighting requires separate consideration under UL 924, while IEC 62034 covers automatic test systems. The DesignLights Consortium (DLC) listing is an important commercial requirement for utility rebate eligibility in North America. Its Linear Ambient category sets the Standard efficacy threshold at 125 lumens per watt and the Premium threshold at 135 lumens per watt. Products designed around the previous 110 lm/W Premium tier may therefore require requalification or may be excluded from funded retrofit programmes. Suppliers offering UL 924-listed emergency fixtures and IEC 62034 automatic test systems have an advantage over manufacturers providing only general luminaires with battery packs. NFPA 101's annual 90-minute duration test makes automatic testing relevant to maintenance costs because it can reduce the need for technicians to inspect individual fixtures manually. Data centre luminaires must deliver 200 lux vertical illuminance on rack faces from aisle-centreline positions using controlled, narrow-beam distributions. They must avoid unnecessary light spill onto cabinet roofs and glare on rack-mounted screens. At the same time, their electrical consumption must remain low because lighting contributes to the facility's non-IT energy load and cooling demand.

Market Dynamics Driver: Rack-face illuminance and Uptime Tier redundancy making lighting part of critical infrastructure
• TIA-942-C and the Uptime Institute Tier framework have made data centre lighting a specification-driven infrastructure component. The TIA-942-C requirement of 500 lux horizontal and 200 lux vertical at one metre above the finished floor prioritises rack-face readability rather than floor-plane illumination alone.
• The vertical requirement determines whether technicians can read port labels, fibre connectors and equipment indicators. Meeting it requires aisle-centreline luminaire positioning and narrow-aisle optics instead of conventional fixtures mounted directly above cabinets.
• Uptime Tier requirements add a redundancy dimension. Tier III facilities require dual feeds and maintainability, while Tier IV facilities require dual circuits, independent emergency systems and zonal redundancy. Lighting must therefore be designed to support the facility's required availability level.
• DLC Linear Ambient efficacy thresholds of 125 lm/W for Standard and 135 lm/W for Premium further influence product selection. Suppliers must deliver the required vertical illuminance while meeting the applicable efficacy threshold.

Make this report your own

Have queries/questions regarding a report

Take advantage of intelligence tailored to your business objective

Reecha Roy

Reecha Roy

Research Analyst

Challenge: PUE pressure and multiple certification requirements
• The main technical challenge is balancing illuminance requirements with energy efficiency. TIA-942-C's requirement for 200 lux vertical illuminance on rack faces requires sufficient light output and controlled optical distribution. However, every watt consumed by lighting adds to the facility's non-IT energy load and contributes to the cooling demand measured through power usage effectiveness (PUE).
• The certification burden adds complexity. Luminaires may need IEC 60598-2-1:2025 safety compliance, UL 924 emergency lighting listing and DLC listing for rebate eligibility. Emergency circuits also require IEC 62034 automatic testing and documented NFPA 101 monthly and annual testing.
• Tier redundancy creates another requirement because fixtures and circuits must support the relevant dual-feed or independent-circuit architecture. A product designed for single-feed installation cannot automatically be substituted into a Tier III or Tier IV facility without changes to the circuit design.

Trend: Occupancy sensing and DCIM integration shifting value towards control systems
• Data centre lighting is moving from continuously energised fixtures towards sensor-based and addressable systems integrated with data centre infrastructure management (DCIM) platforms.
• ASHRAE 90.1-2025 expands occupancy sensing to data centres, bringing white spaces and support rooms under partial-OFF and full-OFF control requirements. Luminaires therefore increasingly need occupancy-sensing interfaces and compatible control systems.
• Addressable lighting systems can also report circuit status and fault locations to DCIM platforms, supporting facility monitoring and maintenance. IEC 62034 automatic testing provides documented emergency-lighting test results and can reduce the need for technicians to visit each fixture during routine testing.
• The competitive focus is consequently expanding beyond luminaire output to include occupancy sensing, addressable controls, emergency-test reporting and DCIM integration.

Segmentation Analysis By Product Type
• LED linear lights are the dominant white-space luminaire category because their form factor supports the aisle-centreline mounting geometry required by TIA-942-C. Narrow-aisle optics help deliver the required vertical illuminance on rack faces.
• LED panel lights serve support areas, network rooms and administrative zones where uniform ambient illumination is required. Their specifications are primarily shaped by EN 12464-1 workplace illuminance requirements rather than the TIA-942 rack-face metric.
• LED downlights are used in corridors, offices and ancillary spaces. They must meet IEC 60598-2-1:2025 safety requirements and, where applicable, NFPA 101 egress illumination requirements.
• Emergency lighting is a separate category because it must satisfy UL 924 listing, NFPA 101's 90-minute duration and 10-second transfer requirements, and IEC 62034 automatic testing. Tier IV facilities additionally require independent emergency circuits.
• Task lighting serves maintenance benches, staging areas and network operations centre consoles where localised higher illuminance is required. IEC 62471 photobiological safety is relevant for high-output LED task luminaires positioned close to occupants' eyes.

Don't pay for what you don't need. Save 30%

Customise your report by selecting specific countries or regions

Specify Scope Now
Reecha Roy
By Lighting Technology
• LED lighting is the preferred technology because it can deliver the required TIA-942 vertical illuminance at lower power consumption than conventional lighting technologies. It can also meet the DLC Linear Ambient efficacy thresholds of 125 lm/W Standard and 135 lm/W Premium.
• Fluorescent lighting remains in the installed base and in some support areas. However, fluorescent phase-out measures in the EU and rising DLC efficacy requirements make it a declining option for new white-space installations.
• Other technologies have limited applications in legacy and specialised installations. Product selection increasingly focuses on LED platform efficiency, optical distribution and control compatibility.

By Installation Type
• Ceiling-mounted installation is the dominant configuration for white-space linear luminaires. Fixtures are positioned above the aisle rather than directly above racks, supporting the TIA-942-C aisle-centreline requirement.
• Rack-integrated lighting is a specialised configuration that provides local illumination within cabinets or on rack frames. It is used where overhead lighting is insufficient for specific maintenance activities or where hot-aisle containment limits light reaching the rack face.
• Wall-mounted lighting serves corridors, stairwells and support rooms. These installations are particularly relevant to NFPA 101 egress illumination requirements and UL 924 emergency lighting provisions.

By Application
• Server rooms and data halls are the largest and most standards-intensive application segment. TIA-942-C vertical illuminance, ASHRAE 90.1-2025 occupancy sensing and Uptime Tier redundancy requirements can apply simultaneously. White-space luminaires are therefore specified primarily around rack-face readability and infrastructure availability.
• Network rooms use linear and panel luminaires on a smaller scale. Their specifications depend on equipment density, maintenance access and room layout.
• Power and electrical rooms, including UPS and switchgear rooms, require luminaires with appropriate ingress protection and thermal tolerance. The supplied material specifies 200 lux on the working plane in front of panels, with emergency lighting designed to meet Tier IV independent-circuit requirements where applicable.
• Support areas, including NOC facilities, administrative offices and staging areas, are generally specified according to EN 12464-1 workplace illuminance requirements. Human-centric tunable-white lighting is more relevant in these spaces because occupants may work there for full shifts rather than visiting only for maintenance.

By Data Center Type
• Hyperscale data centres represent a major volume segment because large campuses require standardised linear luminaires across extensive white-space areas. Procurement is influenced by DLC listing, optical performance and the effect of lighting consumption on PUE.
• Colocation data centres follow TIA-942-C and Uptime Tier requirements, with lighting specifications influenced by the availability level offered to tenants. Shared white spaces may require higher specification depending on the facility's design and service commitments.
• Enterprise data centres are generally smaller but may include a greater proportion of support areas and network operations spaces. Their lighting requirements combine TIA-942 white-space specifications with EN 12464-1 and relevant workplace requirements.
• Edge data centres are a growing segment in deployment volume but typically have fewer luminaires per facility. Their lighting is often specified as a packaged system with integrated emergency and control functions because facilities may be unmanned and maintenance access infrequent.

Regional Analysis • North America operates under TIA-942-C for white-space illuminance, requiring 500 lux horizontal and 200 lux vertical. NFPA 101 establishes egress illumination requirements of 1 foot-candle average and 0.1 foot-candle minimum, with a 90-minute duration and 10-second transfer time. UL 924 governs emergency lighting listing, while ASHRAE 90.1-2025 addresses lighting power density and expanded occupancy sensing in data centres. The DLC Linear Ambient category establishes efficacy thresholds of 125 lm/W for Standard and 135 lm/W for Premium, influencing utility rebate eligibility.
• Europe applies EN 50600 and ISO/IEC 22237 for data centre availability and environmental classifications. EN 12464-1 establishes workplace illuminance requirements for support areas and control rooms, while EN 1838 addresses emergency lighting on escape routes.
• The EU EPBD 2024 requires automatic lighting controls in applicable non-residential buildings above 290 kW by 31 December 2027 and above 70 kW by 31 December 2029. Lighting does not count towards these thresholds, but buildings exceeding them because of HVAC capacity must implement the applicable automatic lighting controls.
• China operates under GB 50174-2017, which specifies general lighting of 300–500 lux, CRI of at least 80 and uniformity of at least 0.7. It prohibits luminaires directly above equipment. The standard also requires standby lighting of at least 10% of general illuminance and at least 50% in manned rooms. Evacuation lighting must provide at least 5 lux in the main computer room corridor and at least 1 lux elsewhere.
• India's ECBC applies to data centres with an IT design load above 100 kW. It establishes lighting power density limits and mandatory lighting controls. The ECBC User Guide for Data Centers provides the compliance pathway for lighting and other electrical end uses.
• The Gulf and wider Middle East apply TIA-942-C and Uptime Tier requirements to white-space lighting, alongside national building-code egress provisions for emergency lighting. Hyperscale and colocation developments specify DLC-listed linear luminaires for white spaces and IEC 60598-2-1:2025-compliant fixtures for support areas.
• Australia applies AS/NZS 1680 for interior lighting and National Construction Code (NCC) egress provisions alongside TIA-942-C requirements for data centre white spaces.
• Japan applies JIS Z 9110 illuminance standards for support areas and TIA-942-C for white-space lighting. PSE certification applies to the electrical portion of the luminaire.

Considered in this report
• Historic Year: 2020
• Base year: 2025
• Estimated year: 2026
• Forecast year: 2031

Aspects covered in this report
• Global Data Center Lighting Market with its value and forecast along with its segments
• Various drivers and challenges
• On-going trends and developments
• Top profiled companies
• Strategic recommendation
By Product Type
• LED Linear Lights
• LED Panel Lights
• LED Downlights
• Emergency Lighting
• Task Lighting

By Lighting Technology
• LED
• Fluorescent
• Other Technologies

By Installation Type
• Ceiling-Mounted
• Rack-Integrated
• Wall-Mounted

By Application
• Server Rooms
• Data Halls
• Network Rooms
• Power & Electrical Rooms
• Support Areas

By Data Center Type
• Hyperscale
• Colocation
• Enterprise
• Edge Data Centers

Request Table of Contents

First Name

Last Name

Company Name

Job Title

Business Email

Contact Number

Description

Data Center Lighting Market Research FAQs

Key driver: Rack-face illuminance and Uptime Tier redundancy making lighting part of critical infrastructure. Key challenge: PUE pressure and multiple certification requirements. Key trend: Occupancy sensing and DCIM integration shifting value towards control systems.

The report uses 2020 as the historic year, 2025 as the base year, 2026 as the estimated year, with forecasts up to 2031.

The Global Data Center Lighting Market is analysed by product type (LED Linear Lights, LED Panel Lights, LED Downlights, Emergency Lighting, Task Lighting); lighting technology (LED, Fluorescent, Other Technologies); installation type (Ceiling-Mounted, Rack-Integrated, Wall-Mounted); application (Server Rooms, Data Halls, Network Rooms, Power & Electrical Rooms, Support Areas); data center type (Hyperscale, Colocation, Enterprise, Edge Data Centers).

The report covers Global.

This report is open for pre-booking. Pre-book it to receive the full report as soon as it is released. You can also request a free sample and the table of contents in the meantime.

Yes. Bonafide Research can add countries, segments or company profiles to match your requirements. Request customisation.
Logo

Global Data Center Lighting Market Outlook, 2031

ChatGPT Summarize Gemini Summarize Perplexity AI Summarize Grok AI Summarize Claude Summarize

Contact usWe are friendly and approachable, give us a call.