Global Data Center Construction Market Growth (Status and Outlook) 2024-2030

The Data Center Construction market was valued at USD 26.20 billion in 2023, driven by the growth of cloud computing, big data analytics, and the need.

According to our publisher’s latest study, the global Data Center Construction market size was valued at US$ 26200 million in 2023. With growing demand in downstream market, the Data Center Construction is forecast to a readjusted size of US$ 55090 million by 2030 with a CAGR of 11.2% during review period.
The research report highlights the growth potential of the global Data Center Construction market. Data Center Construction are expected to show stable growth in the future market. However, product differentiation, reducing costs, and supply chain optimization remain crucial for the widespread adoption of Data Center Construction. Market players need to invest in research and development, forge strategic partnerships, and align their offerings with evolving consumer preferences to capitalize on the immense opportunities presented by the Data Center Construction market.
A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Whiting-Turner Contracting, Turner Construction, Holder Construction, DPR Construction, Fortis Construction, HITT Contracting, STO Building Group (formerly Structure Tone), JE Dunn Construction, Hensel Phelps and AECOM are the Top 10 players of the global Data Center Construction market. They took up about 45% of the global market.Asia-Pacific is the largest market with a market share of about 40%, followed by North America with a market share of about 35%.
Key Features:
The report on Data Center Construction market reflects various aspects and provide valuable insights into the industry.
Market Size and Growth: The research report provide an overview of the current size and growth of the Data Center Construction market. It may include historical data, market segmentation by Type (e.g., Electrical Construction, Mechanical Construction), and regional breakdowns.
Market Drivers and Challenges: The report can identify and analyse the factors driving the growth of the Data Center Construction market, such as government regulations, environmental concerns, technological advancements, and changing consumer preferences. It can also highlight the challenges faced by the industry, including infrastructure limitations, range anxiety, and high upfront costs.
Market Drivers:
Rapid Expansion of Cloud Services: The increasing adoption of cloud services is driving the demand for data centers, as cloud providers require large-scale infrastructure to support their services.
Growing Demand for Big Data Analytics: The exponential growth of big data and the need for real-time data processing and analysis are driving the demand for data centers.
Increasing Adoption of IoT and AI: The proliferation of IoT devices and the growing adoption of AI and machine learning technologies are generating massive amounts of data, which requires data centers to store, process, and analyze.
Need for Edge Computing: The increasing demand for low-latency and high-bandwidth applications is driving the need for edge computing, which requires data centers to be built closer to the end-users.
Government Regulations and Compliance: Governments are implementing regulations and standards for data center construction, such as the General Data Protection Regulation (GDPR) and the Health Insurance Portability and Accountability Act (HIPAA), which are driving the demand for data centers.
Market Challenges:
Power and Cooling Constraints: The increasing demand for data centers is putting pressure on power and cooling infrastructure, making it challenging to build and operate data centers.
High Initial Investment Costs: Building a data center requires significant upfront investment, which can be a barrier for many organizations.
Environmental Concerns: Data centers are significant energy consumers, and environmental concerns related to energy consumption and carbon emissions are becoming increasingly important.
Limited Availability of Suitable Locations: Finding suitable locations for data center construction is challenging, especially in densely populated urban areas where land is scarce and expensive.
Regulatory Hurdles and Permitting Processes: Regulatory hurdles and permitting processes can delay data center construction projects, increasing costs and affecting time-to-market.
Security and Cybersecurity Concerns: Data centers require robust security measures to protect against cyber threats, which can be challenging and costly to implement.
Competitive Landscape: The research report provides analysis of the competitive landscape within the Data Center Construction market. It includes profiles of key players, their market share, strategies, and product offerings. The report can also highlight emerging players and their potential impact on the market.
Technological Developments: The research report can delve into the latest technological developments in the Data Center Construction industry. This include advancements in Data Center Construction technology, Data Center Construction new entrants, Data Center Construction new investment, and other innovations that are shaping the future of Data Center Construction.
The global data center construction market is witnessing significant technological advancements, driven by the increasing demand for cloud computing, big data analytics, and the Internet of Things (IoT). Some of the key technological developments in the global data center construction market include:

Artificial Intelligence (AI) and Machine Learning (ML) Integration: AI and ML are being increasingly used in data center construction to optimize energy efficiency, predict maintenance needs, and improve overall performance.
Liquid Cooling Systems: Liquid cooling systems are being adopted to reduce energy consumption and increase data center efficiency. These systems use a liquid coolant to absorb heat from the data center equipment, reducing the need for air conditioning.
Containerized Data Centers: Containerized data centers are gaining popularity due to their ease of deployment, scalability, and reduced construction time. These data centers are pre-fabricated and can be easily transported to the desired location.
Modular Data Centers: Modular data centers are designed to be scalable and can be easily expanded or upgraded as needed. They also reduce construction time and costs.
High-Density Computing: High-density computing is becoming increasingly popular in data centers, allowing for more computing power in a smaller footprint. This reduces energy consumption and increases efficiency.
Edge Computing: Edge computing is a distributed computing model that brings data processing closer to the source of the data. This reduces latency and improves performance, making it ideal for applications such as IoT and real-time analytics.
5G and Edge Computing: The adoption of 5G technology is driving the need for edge computing, which requires data centers to be located closer to the edge of the network.
Data Center Interconnects: Data center interconnects are being developed to connect multiple data centers and enable the exchange of data between them. This improves data center efficiency and reduces latency.
Cloud-Native Data Centers: Cloud-native data centers are designed specifically for cloud computing and offer improved scalability, flexibility, and efficiency.
Autonomous Data Centers: Autonomous data centers are being developed to operate independently, without human intervention. They use AI and ML to monitor and manage the data center, reducing the need for human oversight.
Downstream Procumbent Preference: The report can shed light on customer procumbent behaviour and adoption trends in the Data Center Construction market. It includes factors influencing customer ' purchasing decisions, preferences for Data Center Construction product.
Government Policies and Incentives: The research report analyse the impact of government policies and incentives on the Data Center Construction market. This may include an assessment of regulatory frameworks, subsidies, tax incentives, and other measures aimed at promoting Data Center Construction market. The report also evaluates the effectiveness of these policies in driving market growth.
Environmental Impact and Sustainability: The research report assess the environmental impact and sustainability aspects of the Data Center Construction market.
Market Forecasts and Future Outlook: Based on the analysis conducted, the research report provide market forecasts and outlook for the Data Center Construction industry. This includes projections of market size, growth rates, regional trends, and predictions on technological advancements and policy developments.
Recommendations and Opportunities: The report conclude with recommendations for industry stakeholders, policymakers, and investors. It highlights potential opportunities for market players to capitalize on emerging trends, overcome challenges, and contribute to the growth and development of the Data Center Construction market.
Recommendations:
Invest in Sustainable Data Centers: With the growing emphasis on environmental sustainability, investing in energy-efficient and eco-friendly data centers can be a lucrative opportunity.
Focus on Hyperscale Data Centers: The increasing adoption of hyperscale data centers is driving the demand for large-scale data center construction. Companies should focus on building hyperscale data centers to capitalize on this trend.
Develop Data Centers in Emerging Markets: Emerging markets such as Asia-Pacific, Latin America, and the Middle East are expected to experience significant growth in data center construction. Investing in these regions can provide opportunities for growth and expansion.
Invest in Cloud and Colocation Services: The increasing adoption of cloud computing and colocation services is driving the demand for data center construction. Investing in cloud and colocation services can provide opportunities for revenue growth.
Focus on Data Center Construction in Key Regions: The Americas, Northeast Asia, South and Southeast Asia, Australasia, Middle East and Africa (MEA), and Europe are key regions for data center construction. Focusing on these regions can provide opportunities for growth and expansion.
Opportunities:
Growing Demand for Data Storage: The exponential growth in data consumption is driving the demand for data storage, providing opportunities for data center construction and expansion.
Increasing Adoption of Cloud Services: The increasing adoption of cloud services is driving the demand for data center construction, providing opportunities for growth and expansion.
Growing Demand for Colocation Services: The increasing demand for colocation services is driving the demand for data center construction, providing opportunities for growth and expansion.
Emerging Technologies: Emerging technologies such as artificial intelligence, machine learning, and the Internet of Things (IoT) are driving the demand for data center construction, providing opportunities for growth and expansion.
Government Support: Governments are providing incentives and support for data center construction, providing opportunities for growth and expansion.
Market Segmentation:
Data Center Construction market is split by Type and by Application. For the period 2019-2030, the growth among segments provides accurate calculations and forecasts for consumption value by Type, and by Application in terms of value.
Segmentation by type
Electrical Construction
Mechanical Construction
General Construction
Segmentation by application
Finance
Internet
Telecommunications
Government
Others
This report also splits the market by region:
Americas
United States
Canada
Mexico
Brazil
APAC
China
Japan
Korea
Southeast Asia
India
Australia
Europe
Germany
France
UK
Italy
Russia
Middle East & Africa
Egypt
South Africa
Israel
Turkey
GCC Countries
The below companies that are profiled have been selected based on inputs gathered from primary experts and analyzing the company's coverage, product portfolio, its market penetration.
Whiting-Turner Contracting
Turner Construction
Holder Construction
DPR Construction
Fortis Construction
HITT Contracting
STO Building Group (formerly Structure Tone)
JE Dunn Construction
Hensel Phelps
AECOM
Rogers-O'Brien Construction
Clune Construction
Gilbane
Balfour Beatty US
Mortenson Construction

What's Inside a Bonafide Research`s industry report?

A Bonafide Research industry report provides in-depth market analysis, trends, competitive insights, and strategic recommendations to help businesses make informed decisions.

Download Sample


Make this report your own

Have queries/questions regarding a report

Take advantage of intelligence tailored to your business objective

Anuj Mulhar

Anuj Mulhar

Research Analyst



Don't pay for what you don't need. Save 30%

Customise your report by selecting specific countries or regions

Specify Scope Now
Anuj Mulhar

Table of Contents

  • 1 Scope of the Report
  • 1.1 Market Introduction
  • 1.2 Years Considered
  • 1.3 Research Objectives
  • 1.4 Market Research Methodology
  • 1.5 Research Process and Data Source
  • 1.6 Economic Indicators
  • 1.7 Currency Considered
  • 1.8 Market Estimation Caveats
  • 2 Executive Summary
  • 2.1 World Market Overview
  • 2.1.1 Global Data Center Construction Market Size 2019-2030
  • 2.1.2 Data Center Construction Market Size CAGR by Region 2019 VS 2023 VS 2030
  • 2.2 Data Center Construction Segment by Type
  • 2.2.1 Electrical Construction
  • 2.2.2 Mechanical Construction
  • 2.2.3 General Construction
  • 2.3 Data Center Construction Market Size by Type
  • 2.3.1 Data Center Construction Market Size CAGR by Type (2019 VS 2023 VS 2030)
  • 2.3.2 Global Data Center Construction Market Size Market Share by Type (2019-2024)
  • 2.4 Data Center Construction Segment by Application
  • 2.4.1 Finance
  • 2.4.2 Internet
  • 2.4.3 Telecommunications
  • 2.4.4 Government
  • 2.4.5 Others
  • 2.5 Data Center Construction Market Size by Application
  • 2.5.1 Data Center Construction Market Size CAGR by Application (2019 VS 2023 VS 2030)
  • 2.5.2 Global Data Center Construction Market Size Market Share by Application (2019-2024)
  • 3 Data Center Construction Market Size by Player
  • 3.1 Data Center Construction Market Size Market Share by Players
  • 3.1.1 Global Data Center Construction Revenue by Players (2019-2024)
  • 3.1.2 Global Data Center Construction Revenue Market Share by Players (2019-2024)
  • 3.2 Global Data Center Construction Key Players Head office and Products Offered
  • 3.3 Market Concentration Rate Analysis
  • 3.3.1 Competition Landscape Analysis
  • 3.3.2 Concentration Ratio (CR3, CR5 and CR10) & (2022-2024)
  • 3.4 New Products and Potential Entrants
  • 3.5 Mergers & Acquisitions, Expansion
  • 4 Data Center Construction by Regions
  • 4.1 Data Center Construction Market Size by Regions (2019-2024)
  • 4.2 Americas Data Center Construction Market Size Growth (2019-2024)
  • 4.3 APAC Data Center Construction Market Size Growth (2019-2024)
  • 4.4 Europe Data Center Construction Market Size Growth (2019-2024)
  • 4.5 Middle East & Africa Data Center Construction Market Size Growth (2019-2024)
  • 5 Americas
  • 5.1 Americas Data Center Construction Market Size by Country (2019-2024)
  • 5.2 Americas Data Center Construction Market Size by Type (2019-2024)
  • 5.3 Americas Data Center Construction Market Size by Application (2019-2024)
  • 5.4 United States
  • 5.5 Canada
  • 5.6 Mexico
  • 5.7 Brazil
  • 6 APAC
  • 6.1 APAC Data Center Construction Market Size by Region (2019-2024)
  • 6.2 APAC Data Center Construction Market Size by Type (2019-2024)
  • 6.3 APAC Data Center Construction Market Size by Application (2019-2024)
  • 6.4 China
  • 6.5 Japan
  • 6.6 Korea
  • 6.7 Southeast Asia
  • 6.8 India
  • 6.9 Australia
  • 7 Europe
  • 7.1 Europe Data Center Construction by Country (2019-2024)
  • 7.2 Europe Data Center Construction Market Size by Type (2019-2024)
  • 7.3 Europe Data Center Construction Market Size by Application (2019-2024)
  • 7.4 Germany
  • 7.5 France
  • 7.6 UK
  • 7.7 Italy
  • 7.8 Russia
  • 8 Middle East & Africa
  • 8.1 Middle East & Africa Data Center Construction by Region (2019-2024)
  • 8.2 Middle East & Africa Data Center Construction Market Size by Type (2019-2024)
  • 8.3 Middle East & Africa Data Center Construction Market Size by Application (2019-2024)
  • 8.4 Egypt
  • 8.5 South Africa
  • 8.6 Israel
  • 8.7 Turkey
  • 8.8 GCC Countries
  • 9 Market Drivers, Challenges and Trends
  • 9.1 Market Drivers & Growth Opportunities
  • 9.2 Market Challenges & Risks
  • 9.3 Industry Trends
  • 10 Global Data Center Construction Market Forecast
  • 10.1 Global Data Center Construction Forecast by Regions (2025-2030)
  • 10.1.1 Global Data Center Construction Forecast by Regions (2025-2030)
  • 10.1.2 Americas Data Center Construction Forecast
  • 10.1.3 APAC Data Center Construction Forecast
  • 10.1.4 Europe Data Center Construction Forecast
  • 10.1.5 Middle East & Africa Data Center Construction Forecast
  • 10.2 Americas Data Center Construction Forecast by Country (2025-2030)
  • 10.2.1 United States Data Center Construction Market Forecast
  • 10.2.2 Canada Data Center Construction Market Forecast
  • 10.2.3 Mexico Data Center Construction Market Forecast
  • 10.2.4 Brazil Data Center Construction Market Forecast
  • 10.3 APAC Data Center Construction Forecast by Region (2025-2030)
  • 10.3.1 China Data Center Construction Market Forecast
  • 10.3.2 Japan Data Center Construction Market Forecast
  • 10.3.3 Korea Data Center Construction Market Forecast
  • 10.3.4 Southeast Asia Data Center Construction Market Forecast
  • 10.3.5 India Data Center Construction Market Forecast
  • 10.3.6 Australia Data Center Construction Market Forecast
  • 10.4 Europe Data Center Construction Forecast by Country (2025-2030)
  • 10.4.1 Germany Data Center Construction Market Forecast
  • 10.4.2 France Data Center Construction Market Forecast
  • 10.4.3 UK Data Center Construction Market Forecast
  • 10.4.4 Italy Data Center Construction Market Forecast
  • 10.4.5 Russia Data Center Construction Market Forecast
  • 10.5 Middle East & Africa Data Center Construction Forecast by Region (2025-2030)
  • 10.5.1 Egypt Data Center Construction Market Forecast
  • 10.5.2 South Africa Data Center Construction Market Forecast
  • 10.5.3 Israel Data Center Construction Market Forecast
  • 10.5.4 Turkey Data Center Construction Market Forecast
  • 10.5.5 GCC Countries Data Center Construction Market Forecast
  • 10.6 Global Data Center Construction Forecast by Type (2025-2030)
  • 10.7 Global Data Center Construction Forecast by Application (2025-2030)
  • 11 Key Players Analysis
  • 11.1 Whiting-Turner Contracting
  • 11.1.1 Whiting-Turner Contracting Company Information
  • 11.1.2 Whiting-Turner Contracting Data Center Construction Product Offered
  • 11.1.3 Whiting-Turner Contracting Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.1.4 Whiting-Turner Contracting Main Business Overview
  • 11.1.5 Whiting-Turner Contracting Latest Developments
  • 11.2 Turner Construction
  • 11.2.1 Turner Construction Company Information
  • 11.2.2 Turner Construction Data Center Construction Product Offered
  • 11.2.3 Turner Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.2.4 Turner Construction Main Business Overview
  • 11.2.5 Turner Construction Latest Developments
  • 11.3 Holder Construction
  • 11.3.1 Holder Construction Company Information
  • 11.3.2 Holder Construction Data Center Construction Product Offered
  • 11.3.3 Holder Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.3.4 Holder Construction Main Business Overview
  • 11.3.5 Holder Construction Latest Developments
  • 11.4 DPR Construction
  • 11.4.1 DPR Construction Company Information
  • 11.4.2 DPR Construction Data Center Construction Product Offered
  • 11.4.3 DPR Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.4.4 DPR Construction Main Business Overview
  • 11.4.5 DPR Construction Latest Developments
  • 11.5 Fortis Construction
  • 11.5.1 Fortis Construction Company Information
  • 11.5.2 Fortis Construction Data Center Construction Product Offered
  • 11.5.3 Fortis Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.5.4 Fortis Construction Main Business Overview
  • 11.5.5 Fortis Construction Latest Developments
  • 11.6 HITT Contracting
  • 11.6.1 HITT Contracting Company Information
  • 11.6.2 HITT Contracting Data Center Construction Product Offered
  • 11.6.3 HITT Contracting Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.6.4 HITT Contracting Main Business Overview
  • 11.6.5 HITT Contracting Latest Developments
  • 11.7 STO Building Group (formerly Structure Tone)
  • 11.7.1 STO Building Group (formerly Structure Tone) Company Information
  • 11.7.2 STO Building Group (formerly Structure Tone) Data Center Construction Product Offered
  • 11.7.3 STO Building Group (formerly Structure Tone) Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.7.4 STO Building Group (formerly Structure Tone) Main Business Overview
  • 11.7.5 STO Building Group (formerly Structure Tone) Latest Developments
  • 11.8 JE Dunn Construction
  • 11.8.1 JE Dunn Construction Company Information
  • 11.8.2 JE Dunn Construction Data Center Construction Product Offered
  • 11.8.3 JE Dunn Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.8.4 JE Dunn Construction Main Business Overview
  • 11.8.5 JE Dunn Construction Latest Developments
  • 11.9 Hensel Phelps
  • 11.9.1 Hensel Phelps Company Information
  • 11.9.2 Hensel Phelps Data Center Construction Product Offered
  • 11.9.3 Hensel Phelps Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.9.4 Hensel Phelps Main Business Overview
  • 11.9.5 Hensel Phelps Latest Developments
  • 11.10 AECOM
  • 11.10.1 AECOM Company Information
  • 11.10.2 AECOM Data Center Construction Product Offered
  • 11.10.3 AECOM Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.10.4 AECOM Main Business Overview
  • 11.10.5 AECOM Latest Developments
  • 11.11 Rogers-O'Brien Construction
  • 11.11.1 Rogers-O'Brien Construction Company Information
  • 11.11.2 Rogers-O'Brien Construction Data Center Construction Product Offered
  • 11.11.3 Rogers-O'Brien Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.11.4 Rogers-O'Brien Construction Main Business Overview
  • 11.11.5 Rogers-O'Brien Construction Latest Developments
  • 11.12 Clune Construction
  • 11.12.1 Clune Construction Company Information
  • 11.12.2 Clune Construction Data Center Construction Product Offered
  • 11.12.3 Clune Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.12.4 Clune Construction Main Business Overview
  • 11.12.5 Clune Construction Latest Developments
  • 11.13 Gilbane
  • 11.13.1 Gilbane Company Information
  • 11.13.2 Gilbane Data Center Construction Product Offered
  • 11.13.3 Gilbane Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.13.4 Gilbane Main Business Overview
  • 11.13.5 Gilbane Latest Developments
  • 11.14 Balfour Beatty US
  • 11.14.1 Balfour Beatty US Company Information
  • 11.14.2 Balfour Beatty US Data Center Construction Product Offered
  • 11.14.3 Balfour Beatty US Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.14.4 Balfour Beatty US Main Business Overview
  • 11.14.5 Balfour Beatty US Latest Developments
  • 11.15 Mortenson Construction
  • 11.15.1 Mortenson Construction Company Information
  • 11.15.2 Mortenson Construction Data Center Construction Product Offered
  • 11.15.3 Mortenson Construction Data Center Construction Revenue, Gross Margin and Market Share (2019-2024)
  • 11.15.4 Mortenson Construction Main Business Overview
  • 11.15.5 Mortenson Construction Latest Developments
  • 12 Research Findings and Conclusion

Table 1. Data Center Construction Market Size CAGR by Region (2019 VS 2023 VS 2030) & ($ Millions) Table 2. Major Players of Electrical Construction Table 3. Major Players of Mechanical Construction Table 4. Major Players of General Construction Table 5. Data Center Construction Market Size CAGR by Type (2019 VS 2023 VS 2030) & ($ Millions) Table 6. Global Data Center Construction Market Size by Type (2019-2024) & ($ Millions) Table 7. Global Data Center Construction Market Size Market Share by Type (2019-2024) Table 8. Data Center Construction Market Size CAGR by Application (2019 VS 2023 VS 2030) & ($ Millions) Table 9. Global Data Center Construction Market Size by Application (2019-2024) & ($ Millions) Table 10. Global Data Center Construction Market Size Market Share by Application (2019-2024) Table 11. Global Data Center Construction Revenue by Players (2019-2024) & ($ Millions) Table 12. Global Data Center Construction Revenue Market Share by Player (2019-2024) Table 13. Data Center Construction Key Players Head office and Products Offered Table 14. Data Center Construction Concentration Ratio (CR3, CR5 and CR10) & (2022-2024) Table 15. New Products and Potential Entrants Table 16. Mergers & Acquisitions, Expansion Table 17. Global Data Center Construction Market Size by Regions 2019-2024 & ($ Millions) Table 18. Global Data Center Construction Market Size Market Share by Regions (2019-2024) Table 19. Global Data Center Construction Revenue by Country/Region (2019-2024) & ($ millions) Table 20. Global Data Center Construction Revenue Market Share by Country/Region (2019-2024) Table 21. Americas Data Center Construction Market Size by Country (2019-2024) & ($ Millions) Table 22. Americas Data Center Construction Market Size Market Share by Country (2019-2024) Table 23. Americas Data Center Construction Market Size by Type (2019-2024) & ($ Millions) Table 24. Americas Data Center Construction Market Size Market Share by Type (2019-2024) Table 25. Americas Data Center Construction Market Size by Application (2019-2024) & ($ Millions) Table 26. Americas Data Center Construction Market Size Market Share by Application (2019-2024) Table 27. APAC Data Center Construction Market Size by Region (2019-2024) & ($ Millions) Table 28. APAC Data Center Construction Market Size Market Share by Region (2019-2024) Table 29. APAC Data Center Construction Market Size by Type (2019-2024) & ($ Millions) Table 30. APAC Data Center Construction Market Size Market Share by Type (2019-2024) Table 31. APAC Data Center Construction Market Size by Application (2019-2024) & ($ Millions) Table 32. APAC Data Center Construction Market Size Market Share by Application (2019-2024) Table 33. Europe Data Center Construction Market Size by Country (2019-2024) & ($ Millions) Table 34. Europe Data Center Construction Market Size Market Share by Country (2019-2024) Table 35. Europe Data Center Construction Market Size by Type (2019-2024) & ($ Millions) Table 36. Europe Data Center Construction Market Size Market Share by Type (2019-2024) Table 37. Europe Data Center Construction Market Size by Application (2019-2024) & ($ Millions) Table 38. Europe Data Center Construction Market Size Market Share by Application (2019-2024) Table 39. Middle East & Africa Data Center Construction Market Size by Region (2019-2024) & ($ Millions) Table 40. Middle East & Africa Data Center Construction Market Size Market Share by Region (2019-2024) Table 41. Middle East & Africa Data Center Construction Market Size by Type (2019-2024) & ($ Millions) Table 42. Middle East & Africa Data Center Construction Market Size Market Share by Type (2019-2024) Table 43. Middle East & Africa Data Center Construction Market Size by Application (2019-2024) & ($ Millions) Table 44. Middle East & Africa Data Center Construction Market Size Market Share by Application (2019-2024) Table 45. Key Market Drivers & Growth Opportunities of Data Center Construction Table 46. Key Market Challenges & Risks of Data Center Construction Table 47. Key Industry Trends of Data Center Construction Table 48. Global Data Center Construction Market Size Forecast by Regions (2025-2030) & ($ Millions) Table 49. Global Data Center Construction Market Size Market Share Forecast by Regions (2025-2030) Table 50. Global Data Center Construction Market Size Forecast by Type (2025-2030) & ($ Millions) Table 51. Global Data Center Construction Market Size Forecast by Application (2025-2030) & ($ Millions) Table 52. Whiting-Turner Contracting Details, Company Type, Data Center Construction Area Served and Its Competitors Table 53. Whiting-Turner Contracting Data Center Construction Product Offered Table 54. Whiting-Turner Contracting Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 55. Whiting-Turner Contracting Main Business Table 56. Whiting-Turner Contracting Latest Developments Table 57. Turner Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 58. Turner Construction Data Center Construction Product Offered Table 59. Turner Construction Main Business Table 60. Turner Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 61. Turner Construction Latest Developments Table 62. Holder Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 63. Holder Construction Data Center Construction Product Offered Table 64. Holder Construction Main Business Table 65. Holder Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 66. Holder Construction Latest Developments Table 67. DPR Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 68. DPR Construction Data Center Construction Product Offered Table 69. DPR Construction Main Business Table 70. DPR Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 71. DPR Construction Latest Developments Table 72. Fortis Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 73. Fortis Construction Data Center Construction Product Offered Table 74. Fortis Construction Main Business Table 75. Fortis Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 76. Fortis Construction Latest Developments Table 77. HITT Contracting Details, Company Type, Data Center Construction Area Served and Its Competitors Table 78. HITT Contracting Data Center Construction Product Offered Table 79. HITT Contracting Main Business Table 80. HITT Contracting Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 81. HITT Contracting Latest Developments Table 82. STO Building Group (formerly Structure Tone) Details, Company Type, Data Center Construction Area Served and Its Competitors Table 83. STO Building Group (formerly Structure Tone) Data Center Construction Product Offered Table 84. STO Building Group (formerly Structure Tone) Main Business Table 85. STO Building Group (formerly Structure Tone) Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 86. STO Building Group (formerly Structure Tone) Latest Developments Table 87. JE Dunn Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 88. JE Dunn Construction Data Center Construction Product Offered Table 89. JE Dunn Construction Main Business Table 90. JE Dunn Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 91. JE Dunn Construction Latest Developments Table 92. Hensel Phelps Details, Company Type, Data Center Construction Area Served and Its Competitors Table 93. Hensel Phelps Data Center Construction Product Offered Table 94. Hensel Phelps Main Business Table 95. Hensel Phelps Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 96. Hensel Phelps Latest Developments Table 97. AECOM Details, Company Type, Data Center Construction Area Served and Its Competitors Table 98. AECOM Data Center Construction Product Offered Table 99. AECOM Main Business Table 100. AECOM Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 101. AECOM Latest Developments Table 102. Rogers-O'Brien Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 103. Rogers-O'Brien Construction Data Center Construction Product Offered Table 104. Rogers-O'Brien Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 105. Rogers-O'Brien Construction Main Business Table 106. Rogers-O'Brien Construction Latest Developments Table 107. Clune Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 108. Clune Construction Data Center Construction Product Offered Table 109. Clune Construction Main Business Table 110. Clune Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 111. Clune Construction Latest Developments Table 112. Gilbane Details, Company Type, Data Center Construction Area Served and Its Competitors Table 113. Gilbane Data Center Construction Product Offered Table 114. Gilbane Main Business Table 115. Gilbane Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 116. Gilbane Latest Developments Table 117. Balfour Beatty US Details, Company Type, Data Center Construction Area Served and Its Competitors Table 118. Balfour Beatty US Data Center Construction Product Offered Table 119. Balfour Beatty US Main Business Table 120. Balfour Beatty US Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 121. Balfour Beatty US Latest Developments Table 122. Mortenson Construction Details, Company Type, Data Center Construction Area Served and Its Competitors Table 123. Mortenson Construction Data Center Construction Product Offered Table 124. Mortenson Construction Main Business Table 125. Mortenson Construction Data Center Construction Revenue ($ million), Gross Margin and Market Share (2019-2024) Table 126. Mortenson Construction Latest Developments

Figure 1. Data Center Construction Report Years Considered Figure 2. Research Objectives Figure 3. Research Methodology Figure 4. Research Process and Data Source Figure 5. Global Data Center Construction Market Size Growth Rate 2019-2030 ($ Millions) Figure 6. Data Center Construction Sales by Geographic Region (2019, 2023 & 2030) & ($ millions) Figure 7. Data Center Construction Sales Market Share by Country/Region (2023) Figure 8. Data Center Construction Sales Market Share by Country/Region (2019, 2023 & 2030) Figure 9. Global Data Center Construction Market Size Market Share by Type in 2023 Figure 10. Data Center Construction in Finance Figure 11. Global Data Center Construction Market: Finance (2019-2024) & ($ Millions) Figure 12. Data Center Construction in Internet Figure 13. Global Data Center Construction Market: Internet (2019-2024) & ($ Millions) Figure 14. Data Center Construction in Telecommunications Figure 15. Global Data Center Construction Market: Telecommunications (2019-2024) & ($ Millions) Figure 16. Data Center Construction in Government Figure 17. Global Data Center Construction Market: Government (2019-2024) & ($ Millions) Figure 18. Data Center Construction in Others Figure 19. Global Data Center Construction Market: Others (2019-2024) & ($ Millions) Figure 20. Global Data Center Construction Market Size Market Share by Application in 2023 Figure 21. Global Data Center Construction Revenue Market Share by Player in 2023 Figure 22. Global Data Center Construction Market Size Market Share by Regions (2019-2024) Figure 23. Americas Data Center Construction Market Size 2019-2024 ($ Millions) Figure 24. APAC Data Center Construction Market Size 2019-2024 ($ Millions) Figure 25. Europe Data Center Construction Market Size 2019-2024 ($ Millions) Figure 26. Middle East & Africa Data Center Construction Market Size 2019-2024 ($ Millions) Figure 27. Americas Data Center Construction Value Market Share by Country in 2023 Figure 28. United States Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 29. Canada Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 30. Mexico Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 31. Brazil Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 32. APAC Data Center Construction Market Size Market Share by Region in 2023 Figure 33. APAC Data Center Construction Market Size Market Share by Type in 2023 Figure 34. APAC Data Center Construction Market Size Market Share by Application in 2023 Figure 35. China Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 36. Japan Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 37. Korea Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 38. Southeast Asia Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 39. India Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 40. Australia Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 41. Europe Data Center Construction Market Size Market Share by Country in 2023 Figure 42. Europe Data Center Construction Market Size Market Share by Type (2019-2024) Figure 43. Europe Data Center Construction Market Size Market Share by Application (2019-2024) Figure 44. Germany Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 45. France Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 46. UK Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 47. Italy Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 48. Russia Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 49. Middle East & Africa Data Center Construction Market Size Market Share by Region (2019-2024) Figure 50. Middle East & Africa Data Center Construction Market Size Market Share by Type (2019-2024) Figure 51. Middle East & Africa Data Center Construction Market Size Market Share by Application (2019-2024) Figure 52. Egypt Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 53. South Africa Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 54. Israel Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 55. Turkey Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 56. GCC Country Data Center Construction Market Size Growth 2019-2024 ($ Millions) Figure 57. Americas Data Center Construction Market Size 2025-2030 ($ Millions) Figure 58. APAC Data Center Construction Market Size 2025-2030 ($ Millions) Figure 59. Europe Data Center Construction Market Size 2025-2030 ($ Millions) Figure 60. Middle East & Africa Data Center Construction Market Size 2025-2030 ($ Millions) Figure 61. United States Data Center Construction Market Size 2025-2030 ($ Millions) Figure 62. Canada Data Center Construction Market Size 2025-2030 ($ Millions) Figure 63. Mexico Data Center Construction Market Size 2025-2030 ($ Millions) Figure 64. Brazil Data Center Construction Market Size 2025-2030 ($ Millions) Figure 65. China Data Center Construction Market Size 2025-2030 ($ Millions) Figure 66. Japan Data Center Construction Market Size 2025-2030 ($ Millions) Figure 67. Korea Data Center Construction Market Size 2025-2030 ($ Millions) Figure 68. Southeast Asia Data Center Construction Market Size 2025-2030 ($ Millions) Figure 69. India Data Center Construction Market Size 2025-2030 ($ Millions) Figure 70. Australia Data Center Construction Market Size 2025-2030 ($ Millions) Figure 71. Germany Data Center Construction Market Size 2025-2030 ($ Millions) Figure 72. France Data Center Construction Market Size 2025-2030 ($ Millions) Figure 73. UK Data Center Construction Market Size 2025-2030 ($ Millions) Figure 74. Italy Data Center Construction Market Size 2025-2030 ($ Millions) Figure 75. Russia Data Center Construction Market Size 2025-2030 ($ Millions) Figure 76. Spain Data Center Construction Market Size 2025-2030 ($ Millions) Figure 77. Egypt Data Center Construction Market Size 2025-2030 ($ Millions) Figure 78. South Africa Data Center Construction Market Size 2025-2030 ($ Millions) Figure 79. Israel Data Center Construction Market Size 2025-2030 ($ Millions) Figure 80. Turkey Data Center Construction Market Size 2025-2030 ($ Millions) Figure 81. GCC Countries Data Center Construction Market Size 2025-2030 ($ Millions) Figure 82. Global Data Center Construction Market Size Market Share Forecast by Type (2025-2030) Figure 83. Global Data Center Construction Market Size Market Share Forecast by Application (2025-2030)
Logo

Global Data Center Construction Market Growth (Status and Outlook) 2024-2030

ChatGPT Summarize Gemini Summarize Perplexity AI Summarize Grok AI Summarize Claude Summarize

Contact usWe are friendly and approachable, give us a call.